Tel:0760-23781357  Email:michael@zhmold.com
About Us Design Mold Making Full Injection Molding & Production Products Quality Assurance Contact Us 中文版 | English  
About Us
About Us
Organization Chart
Mchinery List
Factory Photos
FAQ
www.zhmold.com  
Your position:About Us>>FAQ
 

What is your standard design lead time?

Design lead time is 3-4 days for initial 2D design and 3-4 days for 3D design upon approval of 2D design.

What is your standard quote lead time?

Quotes are provided 2-4 days from receipt of RFQ.

What is your common lead time?

Our common lead time from design approval to T1 sampling is 4-7 weeks, depending on mold requirements and part complexity.

What is your standard warranty for tooling?

Zhao Hong Precision Mold warrants the quality, workmanship and materials used in producing molds for a period of 180 days or 250,000 cycles, whichever occurs first, from the date of delivery of the mold(s) to the customer.  Zhao Hong Precision Mold will, at its sole discretion, repair or replace all parts determined to be defective as to quality, workmanship or materials.  The customer is solely responsible for mold design, design specifications and design approval. No warranty is provided concerning the design of the mold.  Any failure of the mold or any mold components arising from or related to design is not warranted.

What is your standard warranty for molding?

Zhao Hong Precision Mold warrants the molded products it produces to client design specifications to be free of defects in quality, workmanship and materials for a period of twelve months from the shipment date and will, at its sole discretion, repair or replace products determined to be defective.  This warranty shall not apply to breakage caused by product misuse.  Zhao Hong Precision Mold does not warrant the customer design or product defects or failure arising from customer design or design-related issues.

Are factory visits encouraged?

Yes, we welcome customers to visit our facility and we will work with customers to assist in obtaining the necessary Visa paperwork, travel plans, accommodations, etc.

Do you handle freight of molds and molded products?

Door to door freight of molds or molded products going to be managed if requested by customer.  Freight is provided in the quotation as an separated item.

Do you use inch or metric components?

All mold components for our US customers are made using standard inch components, unless otherwise specified by customer.

Can you provide US made components?

Through our US office we can purchase any requested US brand components per your specifications.

What are your standard payment terms for tooling?

We request a 50% deposit with your order.  30% payment is due after T1 samples and the 20% balance is due 14 days after the receipt of the mold.  The freight amount will be invoiced in full after T1 sampling, and is payable prior to mold shipment.

What are your standard payment terms for molding?

Standard terms for molding are a 50% deposit with order and the 50% balance is due prior to product shipment, including all freight costs.

Copyright© ZHAOHONG PRECISION MOULD CO.,LTD  Webdesign:www.linkchant.com